HAL’s Promise of Delivering 2 TEJAS MK-1A Jets Hinges On 2 Critical Elements; What You Must Know
The delivery of GE Aerospace’s F404-IN20 engines to Hindustan Aeronautics Limited (HAL) marks a critical turning point for the TEJAS MK-1A program, which has struggled to maintain schedule fidelity due to delays in engine supply and certification bottlenecks. The third engine from the 99 ordered in 2021 has now reached HAL’s Bangalore production complex, with the fourth set to arrive by the end
The delivery of GE Aerospace’s F404-IN20 engines to Hindustan Aeronautics Limited (HAL) marks a critical turning point for the TEJAS MK-1A program, which has struggled to maintain schedule fidelity due to delays in engine supply and certification bottlenecks. The third engine from the 99 ordered in 2021 has now reached HAL’s Bangalore production complex, with the fourth set to arrive by the end
Go to Source