ISRO Successfully Hot Tests CE20 Cryogenic Engine At 22 Tons For LVM3-M7 Mission
The Indian Space Research Organisation has successfully carried out the flight acceptance hot test of the CE20 cryogenic engine earmarked for the seventh operational mission of the LVM-3 launch vehicle, designated LVM-3-M7.The test was conducted on 9 September 2026 at the Main Engine and Stage Test facility located at the Liquid Propulsion Systems Centre (LPSC) (ISRO Propulsion Complex) in
The Indian Space Research Organisation has successfully carried out the flight acceptance hot test of the CE20 cryogenic engine earmarked for the seventh operational mission of the LVM-3 launch vehicle, designated LVM-3-M7.The test was conducted on 9 September 2026 at the Main Engine and Stage Test facility located at the Liquid Propulsion Systems Centre (LPSC) (ISRO Propulsion Complex) in
Go to Source
