1948 | The Spark
A decisive push came from Nicola Genua, an old friend from Benevento that we met in Camaldoli. We got from him a letter containing a check that was his initial contribution to the construction of the aircraft. His gesture was fundamental to carry on with the project and moved us; but it was not his last… in the two years that followed, his constant support was precious.
We worked on the preparation of the construction drawings for many weeks with the help of Giovanni Sessa, who spent every day at the drawing table. Gino took care of the calculations and I took care of our garage, turning it into a shop as best as I could. We built a rudimental circular saw to cut the wood strips, bought a set of tools to work the wood, and equipped a big work bench.
In those days, we were joined by Pio Canestrelli, a valiant model aircraft enthusiast who, together with another brilliant character, Armando Perifano[1], worked in a small shop in Via Caracciolo, making small combustion engines for model aircrafts.
They both moved with all their equipment, including a lathe that was indispensable for us, to what had become by then our shop, in Via Tasso. Practically, the room was crammed, so we had to tear down a partition wall to use also the adjacent basement, previously used as a storage room. The demolition of the wall enraged our father, who, on his return from Faicchio, found the room totally changed.
[1]Armando Perifano (1923–2000), an extraordinary builder of engines for model aircrafts, lived in Naples. He had a weird lathe actuated by a pedal, like the old Singer sewing machines. With that lathe, perhaps a remnant of the Great War, he would build complete engines. For instance, he built for Buonomo the Pierino, a 2 cc with very elegant lines that featured cutting-edge solutions. He would build aluminum pistons in tubes of chrome-plated steel, starting from big railway bolts well before 1950, and since the bad aluminum he had would wear quickly, he began to anodize the external surface with good results.
We had a rather tough confrontation, because our father was not happy with our activity, worried about the course of our studies, but the bond between my brother and I in the family was unbeatable.

Building the Wings
The work continued without interruption, and everybody was taking part in it very seriously. In a few weeks, we built all the ribs and assembled the first half-wing.
The needs of our small shop were many, our finances were limited, and we were forced to make endless sacrifices: we often had to give up our nights out to save the money necessary to buy the materials we needed.
Our means of transport was a Lambretta 125, on which we even carried the oxygen bottle for the oxyacetylene welder that we had filled in the railway area.
The wing hardware was built by Rolando Passardi, the son of the manager of the Magnaghi industrial plant, with the help of his shop’s technicians. To apply those parts to the wing spars, we had to transport everything to the Magnaghi plant, since we had no drill press, which was necessary for boring the holes.
We carried the spars, about 4 meters long, on the Lambretta. I was driving and Peppe Marengo, a friend of ours, held the long but light wooden slats in a precarious balance. At every crossroad, Marengo would get off the Lambretta and walk, carrying the material on his shoulder to prevent the traffic cops from stopping us.
Finally, we began assembling the wing, thus savoring the satisfaction of beginning to see the venture we always dreamed about become reality.
Facing the RAI
The frame, with a simple design, was not difficult to make; instead, glueing the plywood covering was rather complex and very challenging. While we were keeping drawing the various parts, Gino completed the calculations for the dimensioning of the frame that we had to deliver to the RAI (Italian Aircraft Registry), to get the permit to build and the ensuing certification.
We certainly underestimated the RAI checks. Indeed, we had to overcome huge obstacles, represented by all the tests on the materials, the static tests on the frame and the flight tests.
We lodged the Supervision Application with the RAI office in Naples, which at that time was managed by Ferdinando Bonifacio. We all went to the office in via Giovanni Manna, but the meeting degenerated and eventually we were almost thrown out by Mr. Bonifacio that, we thought, insisted on useless and absurd points.
Our mentality was not prepared for that, and our passion could hardly stand any kind of obstacle between us and the attainment of our goal. Crestfallen, we left the RAI office. That night, we parted in Piazza della Borsa, aware that the task was harder and more difficult than ever.

The Fuselage and Technical Challenges
After completing the two half-wings, we began building the fuselage, whose frame was totally made of steel tubes and coated with canvas. We had chosen this type of frame, simpler than the wooden one, although we underestimated the difficulties of welding, a very delicate operation in aeronautical constructions.
We began working on the framework with the help of a welder from the Magnaghi plant, sent by Passardi, who would usually come at night after work and weld until late. We closely observed his work and soon we learned to weld and do the job on our own.
The work was progressing fairly, even though it was getting more and more complex and difficult. The wing-fuselage connection was particularly demanding: to do the work, we built two trestles to support the half-wings in position, placing the fuselage framework so that the connections would fit to be drilled and bored.
The aircraft was taking shape and the room was totally unsuited to accommodate it. We would work until late at night to solve all the problems that were endlessly arising: we could not always follow the drawings due to the continuous changes, necessary during construction. We had to rebuild the flight controls many times, and many of us were disheartened and disillusioned. The aileron control, in particular, was made with a system of levers and stiff rods, but we could not use it due to the excessive clearance of the whole transmission gear.
These continuous technical misfortunes were making us seriously doubt about the actual possibility to achieve our goal; in fact, every now and then, somebody, discouraged, would leave the group, disappearing for several days. These endless technical issues were accompanied by financial problems that we could not always solve.

Static Tests and the Final Rush
Fortunately, in those days, the RAI sent us the approval of the static calculations, and that news was enough to give the group new strength and enthusiasm. After the first step, we had to pass the static tests on the aircraft structure. Gino began immediately to work so as to prepare all test quotes, and I took care of the construction of the necessary equipment.
We built a trestle of steel tube about 4 meters high and we fixed the overturned plane on it, so that we could place the test load on the wing bottom.
The problem of how to make the load was not so easy to solve. Nicola Genua had a huge number of canvas bags sewn; we filled them with sand from the Coroglio beach and transported them in a Topolino with several trips to Via Tasso. We weighed the bags one by one with extreme accuracy and stamped the weight on each of them. In this way, we could measure the load on the structure. To fully understand the difficulties of all those preparations, you must consider that all of the aircraft parts were subject to static tests, with the relevant equipment and calculations.
All this lasted about eight months of endless and grueling work, always under the watchful eye of the RAI, whose commission would come from Rome to witness all tests, always accompanied by Mr. Bonifacio, the engineer from the Naples office. I must acknowledge that eventually, the RAI collaboration was useful and valuable.
The static test of the wing was the most exciting: we loaded more than one ton of sandbags on the two half-wings. The structure bore the weight without damages, proving to be very strong. The RAI engineer Stefano Mossa congratulated Gino: we had passed the first static test, the most important. Another small step towards our goal.
Thrilled by this first success, we took on the other tests with renewed energy. In a few months, we completed the equipment and passed the tests of the tail units, of the ailerons, of the flaps, of the controls and of the fuselage.
I will never be able to explain how hard that work was: months went by, and the aircraft never seemed to take shape; all our energies were absorbed by the tests on the single parts of the plane, and their results still had to be verified. Finally, the test program was completed. The RAI approved all the test reports, giving us the go to finish our airplane.
We still had the problem of the covering: none of us was an expert, so we asked a worker of the Fifth Technical Unit of the Air Force stationed in Capodichino. His name was Tarantino and he was very good: he completed the work in a week, covering the wings, the fuselage and the tail planes. By then, the aircraft had taken shape, our dream was about to come true.
The final rush was enthusiastically quick: in two months, the aircraft was completed, ready to be taken to the Capodichino airport.