LYNN, Mass. — On March 22 the Army’s Improved Turbine Engine Program achieved a significant program milestone with the “light off” — the first time fuel is ignited in the engine to produce power — of the General Electric T901 First Engine to Test, or FETT.
The T901 engine will replace the T700…