In A Major Setback, HAL To Deliver Only 2 TEJAS Jets To IAF, Against The Original Plan of Delivering 18 This Fiscal
The Indian Air Force (IAF) is facing significant setbacks in the delivery of its TEJAS MK-1A jets, with only two aircraft expected to be delivered this year instead of the planned 18. This delay is primarily attributed to ongoing supply chain issues with the General Electric (GE) F404 engines, which are crucial for powering these jets.HAL (Hindustan Aeronautics Limited) will only manage to
The Indian Air Force (IAF) is facing significant setbacks in the delivery of its TEJAS MK-1A jets, with only two aircraft expected to be delivered this year instead of the planned 18. This delay is primarily attributed to ongoing supply chain issues with the General Electric (GE) F404 engines, which are crucial for powering these jets.HAL (Hindustan Aeronautics Limited) will only manage to
Go to Source