Canada finalizes $5.9 billion P-8 Poseidon deal
The first P-8A is expected in 2026, with all aircraft delivered “as early as fall 2027” and full operational capability online by 2033.
The first P-8A is expected in 2026, with all aircraft delivered “as early as fall 2027” and full operational capability online by 2033.