TEJAS Jet Production To Remain Sluggish
The TEJAS MK-1A fighter jet program faces significant production slowdowns due to protracted delays in engine deliveries from General Electric (GE), exacerbating operational challenges for the Indian Air Force (IAF), reports Ajay Banerjee of The Tribue.Causes of Delay: GE’s Engine Supply Chain IssuesGE Aerospace, contracted to supply 99 F404-IN20 engines for the MK-1A, has faced two-year delays
The TEJAS MK-1A fighter jet program faces significant production slowdowns due to protracted delays in engine deliveries from General Electric (GE), exacerbating operational challenges for the Indian Air Force (IAF), reports Ajay Banerjee of The Tribue.Causes of Delay: GE’s Engine Supply Chain IssuesGE Aerospace, contracted to supply 99 F404-IN20 engines for the MK-1A, has faced two-year delays
Go to Source